DETAILS OF WORK – The Banner Production Database will be unavailable while we perform Banner upgrades and apply patches.

SERVICES AFFECTED – Banner Production Database (Banner Admin and Banner Self-Service) and all related third party products (such as MyPace Portal, TouchNet, Appworx, PayPal, E-Procurement, etc.)

REASON FOR WORK – We will be performing Banner upgrades and apply patches.

DETAILS OF WORK – ITS will be performing an upgrade to the network each night during the overnight hours between 12am-2am. During this time, access to Internet (wired/wireless) will be intermittent while work is being performed at the specified locations. Please see below for dates and locations for Valhalla and Pleasantville campuses.

UPGRADE SCHEDULE & LOCATIONS:

Valhalla
•  Summit (Valhalla): Monday, 2/24

Pleasantville Campus
•  Buildings & Grounds Office, Baseball Press Box, Buchsbaum House: Tuesday, 2/25
•  Environmental Farm House, Environmental Pavilion: Wednesday, 2/26
•  Field House, Gannett Cottage, Gannett House, Gannett Studio One: Thursday, 2/27
•  Goldstein: Friday, 2/28

SERVICES AFFECTED – Internet (wired/wireless) connectivity

REASON FOR WORK – This work is necessary to perform a firmware upgrade to network equipment.

DETAILS OF WORK – There will be brief disruptions on all University-wide systems as we apply critical system patches. The downtime on each server will be minimal (15 minutes) during this period.

SERVICES AFFECTED – Listserv, Portal, Web File Storage, Personal web pages, and applications on Appsrv. Special Note: Banner and Blackboard will not be affected.

REASON FOR WORK – Applying security patches to all servers

DETAILS OF WORK –   During this time, access to various IT systems and services will experience an intermittent or temporary interruption on all campuses while maintenance work is being performed.

SERVICES AFFECTED – Banner, Pace email, VPN, File Share, and Skype for Business. Those using applications on Appsrv will also be affected.

REASON FOR WORK – This work is necessary to upgrade core licenses for network equipment.

DETAILS OF WORK – ITS will be performing an upgrade to the network each night during the overnight hours between 2am-4am. During this time, access to Internet (wired/wireless) will be intermittent while work is being performed at the specified locations. Please see below for dates and locations for New York City and Pleasantville campuses.

UPGRADE SCHEDULE & LOCATIONS:

New York City Campus
• 140 William Street: Monday, 2/17
• 110 William Street: Tuesday, 2/18
• 156 William Street: Wednesday, 2/19
•  Midtown Campus: Thursday, 2/20

Pleasantville Campus
•  Mortola Library: Friday, 2/21
•  Choate House: Saturday, 2/22

Note: Above schedule may be extended to 2/23 and 2/24 if needed.

SERVICES AFFECTED – Internet (wired/wireless) connectivity

REASON FOR WORK – This work is necessary to perform a firmware upgrade to network equipment.